To avoid the demolition of this historic landmark, the Hotel Montgomery was relocated during an expansion project at the neighboring Fairmont Hotel.

During the relocation project, the building was moved nearly 200 feet to the south of its previous location. At over 4,800 tons, the Hotel Montgomery is one of the heaviest buildings ever moved.

Kier & Wright provided civil engineering services for the “The Move,” including design of grading and drainage, design of off-site frontage improvements, and preparation of utility relocation plans.

After “The Move,” the Montgomery Hotel, now called the Four Points by Sheraton San Jose Downtown, was renovated and reopened. Kier & Wright provided civil engineering services for the design of parking and utilities at the new site and provided construction staking services for the renovation project.

Project

Four Points by Sheraton San Jose Downtown
San Jose, CA

Project Categories
  • Hotel
  • Urban Infill
Highlights
  • Relocation project to preserve a 4,800-ton historic building.
  • Designed on-site and off-site improvements for “The Move.”
  • Design of improvements for the renovation of the historic hotel.