Merritt Trace Elementary

Back to all Projects
Share

After an arson fire destroyed 16 classrooms, the school library and offices at Merritt Trace Elementary School, the San Jose Unified School District selected a team of consultants to prepare plans for the reconstruction of the portion of the campus that was damaged. Kier & Wright was selected to provide all topographic surveying and civil engineering services for the reconstruction project.

To complete construction of the new building before the upcoming school year, this design-build project progressed on an accelerated timeline, requiring expedited DSA submittal, review and approvals.

The new two-story, 28,000-square-foot building includes 18 classrooms, a library and a computer lab.

Kier & Wright services provided during the project include topographic surveying, grading and drainage design, preparation of a utility plan, preparation of a stormwater pollution prevention plan, and construction staking.

Project

Merritt Trace Elementary
San Jose, CA

Project Categories
  • Education
Highlights
  • Engineering and surveying for a fire replacement project that involved the construction of a new classroom and library building.